Project Management from Survey to Handover
We run insulation, vacuum-jacketed piping and cryogenic system projects with one project team, from the site survey to the handover file. Every project has a responsible engineer, an approved schedule and a weekly progress report.

Project steps
- SurveyLine list, dimensions and photo record of the current condition on site.
- EngineeringThermal calculation, thickness selection, condensation check and detail drawings.
- MaterialsApproved material list, certificates and procurement plan.
- FabricationWorkshop prefabrication and removable jackets; vacuum-jacketed lines fabricated with our manufacturing partners.
- Site workHSE plan, permits to work, daily progress log.
- Testing and acceptanceSurface temperature check; vacuum and helium leak tests on vacuum-jacketed lines.
- Handover fileAs-built drawings, material certificates and inspection records.
- MaintenancePeriodic inspection and repair when needed.
How we control the project
Planning and reporting
- Approved schedule and critical path
- Weekly progress report and photo site log
- Written change management with scope, time and cost impact
Quality and safety
- Material certificates and lot tracking in our ERP
- Inspection plan and inspection records
- Site HSE plan, risk assessment and permits to work
Let’s discuss your project
A line list, a drawing or a short description is enough; we will get back to you for a survey and initial assessment.