Project management

Project Management from Survey to Handover

We run insulation, vacuum-jacketed piping and cryogenic system projects with one project team, from the site survey to the handover file. Every project has a responsible engineer, an approved schedule and a weekly progress report.

Cryogenic skid with clad aerogel insulation

Project steps

  1. SurveyLine list, dimensions and photo record of the current condition on site.
  2. EngineeringThermal calculation, thickness selection, condensation check and detail drawings.
  3. MaterialsApproved material list, certificates and procurement plan.
  4. FabricationWorkshop prefabrication and removable jackets; vacuum-jacketed lines fabricated with our manufacturing partners.
  5. Site workHSE plan, permits to work, daily progress log.
  6. Testing and acceptanceSurface temperature check; vacuum and helium leak tests on vacuum-jacketed lines.
  7. Handover fileAs-built drawings, material certificates and inspection records.
  8. MaintenancePeriodic inspection and repair when needed.

How we control the project

Planning and reporting

  • Approved schedule and critical path
  • Weekly progress report and photo site log
  • Written change management with scope, time and cost impact

Quality and safety

  • Material certificates and lot tracking in our ERP
  • Inspection plan and inspection records
  • Site HSE plan, risk assessment and permits to work

Let’s discuss your project

A line list, a drawing or a short description is enough; we will get back to you for a survey and initial assessment.